As discussed I have put together an RFQ for automated spray process.
全自动喷涂设备
液体-whitfords, xlar/xylan PET油漆
Product Range: Stud bolt, Hex bolt, Nut, Washer.
喷涂的产品:牙条,六角螺栓,螺母点垫片
产品尺寸:
Product Size:
牙条,六角螺栓Diameter直径: ½” through to 4”, Length 长度:2” through to 70” (stud / Hex bolt), Weight Max 重量:100kg
直径: Diameter ½” through to 6” (Nut) 螺母
直径:Diameter ½” through to 8” (Washer) 垫片
Items required in order of relevance:
项目的关联性:
o Programmable Overhead track 有轨道编程系统
o Blast room (automated) quick media change capability 喷涂间有自动化快速变化能力
o Pre Heat through oven up to 50°C 热量在50度以上
o Spray Booth with 2D spray capability for single side coating with paint thickness monitoring capability
喷漆柜与2 d为单边喷雾功能涂料油漆厚度监控能力
o Spray Booth with 2D spray capability for single side coating (opposite to above) with paint thickness monitoring capability possibility to replace with 3D robot and allow only 1 booth pending material coverage.
喷漆柜与2 d为单边喷雾功能涂料与油漆厚度(上面对面)监控功能可能与3 d机器人取代,只允许1个展位等待材料覆盖。
o Through Oven for flash up to 200°C (15-20 min) 15-20分钟内烤箱温度达到200度
o Through Oven for Cure up to 600°C (30 min)30分钟通过烤箱的温度为600度
o Free track to allow cooling up to 2 hours 冷却时间为2小时
Currently I can produce maximum 13,492 pcs of ½” stud bolt in approximately 1hr 10 minutes from spray to cure (oven being constraint) before cooling…to make the track feasible I must have capability to reduce this time dramatically.